Installation and commissioning
- 3-4 weeks prior to the shipment of the equipment, we will communicate with the customer on the site conditions and the required cooperation for installation and commissioning, assisting the customer to plan the site and schedule.
- Upon the arrival of the equipment at the site, the cargo will be unpacked and checked with personnel of both parties on the spot. The equipment will be installed, commissioned, and put into trial production. The design capability will be achieved within the scheduled time limit. Huihe will provide necessary spare parts and accessories during the installation and commissioning.
- Huihe’s engineers sent to the customer’s site are all strictly trained and have rich on-site experience. Besides fulfilling the installation and commissioning, we can also assist the customer to manage the plant and the equipment.